Warehouse freight elevator installation Freight elevator installation consists of four to six people in an installation team, including one skilled fitter and one electrician to be responsible for installation and commissioning. In addition, according to the installation progress, a certain...
Send Inquiry
Description

Freight lift elevator

small goods lift
vertical lift
small cargo lift
freight elevator

Warehouse freight elevator installation

    Freight elevator installation consists of four to six people in an installation team, including one skilled fitter and one electrician to be responsible for installation and commissioning. In addition, according to the installation progress, a certain number of wood, mud, welders, cranes, scaffolders, etc. need to be temporarily equipped to ensure the smooth progress of the installation. For the installation of mechanical and electrical parts, parallel operations can be adopted, and the operation plan shall be formulated by the leader of the installation team. Clear requirements and unified arrangements.

Before the freight elevator is installed, the person in charge of the installation and the user representative should check all the parts and installation materials according to the packing list, and understand the type and control method of the elevator. According to the overall civil layout of the elevator, review the hoistway hole, corbel, pit depth, top floor height, lifting height, number of floors, landing door type, and the net plane size (width × depth) in the hoistway. If any errors are found, the relevant departments should be notified. Correct in time.

The safe operation rules that freight elevator installers must abide by: safety helmets, seat belts and tool bags must be worn when working. Avoid simultaneous operation of up and down in the hoistway. Any live work must be carried out by more than two people.

Scaffolding should be safe and stable, and its bearing capacity should not be less than 2500N/m. The type of scaffolding can be single-ticket type, and the large elevator of more than three tons can be double-ticket type. Scaffolding layout see

The interval between the beams should be 850-900mm, and the beams at the entrance of the landing door should be erected as required.

On the beams of each layer, lay more than two scaffolding boards, each layer should be arranged in a staggered manner, the scaffolding boards should extend about 50mm from the beams, and both ends should be firmly tied to the beams.

When electric welding is used in the shaft, the bundling joints of the nearby slugs should be firmly tied with lead wires with a diameter of 1.2mm to prevent the slugs from catching fire and breaking. During welding and after the work is completed, special attention should be paid to whether there is a fire hazard anywhere in the shaft.

The interval between beams should be 850~900mm, and the interval between scaffolding should be 1700~1800mm

In order to facilitate climbing up and down, steps are added between the two beams of each layer on one side of the scaffold, and the interval is 300-400mm.

For the erection of scaffolding above the top floor, consideration should be given to ease of removal when installing the car.

After the scaffolding has been erected, it must be thoroughly and carefully inspected by the installer before it can be used.

When welding in the shaft, fire extinguishing measures should be provided.

A safe voltage not higher than 36 volts should be used.

Each elevator shaft shall be powered independently, and a power switch shall be provided near the entrance of the bottom shaft.

There should be sufficient brightness in the well, and hand lamp sockets should be set at appropriate locations as needed.

The top floor and bottom pit shall be provided with two or more electric lamps for lighting, and other levels shall also be provided with lighting.

The number of lighting lamps in the machine room shall be the number of elevators × 2 or more.

The power supply required for the construction should be sent to the machine room and the construction site to ensure the use of the construction.

The center line of the car frame, the center line of the door, the clear width of the door, and the center line of the guide rail are marked on the model frame, and the position deviation of each line should not exceed 0.3mm.

Use a thin saw blade to cut a bevel at each point where the plumb line is placed on the model frame, and nail an iron nail next to it for hanging and fixing the plumb line

indoor elevatorplatform elevatormini elevatorascenseur elevatorchina lift elevatorhome electric elevator


Hot Tags: 3 meter cargo lift for warehouse use, China, manufacturers, suppliers, factory, customized, buy, cheap, for sale, made in China

Send Inquiry

(0/10)

clearall