



1. The aerial work platform should be parked indoors to prevent rain erosion and sun exposure.
2. When the aerial work platform is not used for a long time, the power cord of the battery should be removed and the battery should be protected at the same time.
3. Lubricating oil should be frequently injected between various movable parts and in the shaft pins of each working arm to maintain a certain degree of lubrication to reduce wear.
4. After using the towable boom lift for the first 2 months, the hydraulic oil should be replaced, and every six months after that, choose clean refueling tools, and clean the hydraulic oil tank and filter regularly; here it is recommended to use No. 46 anti-wear hydraulic The oil is the best. When the temperature is below 0°C, the antifreeze hydraulic oil must be replaced.
5. When the temperature is below 0℃, the coolant of the diesel engine should be vented to prevent the cylinder block of the diesel engine from freezing and cracking; for other matters, please refer to the instruction manual of the diesel engine.
6. When cleaning and replacing hydraulic components, clean them with firewood or gasoline; for temporarily unused hydraulic components, plug the oil ports and store them in packaging to prevent debris from entering the hydraulic components.
7. It is forbidden to clean with cotton and other fiber fabrics that are easy to fall off to prevent contamination of hydraulic components.












Hot Tags: towable boom lifts for aerial work, China, manufacturers, suppliers, factory, customized, buy, cheap, for sale, made in China
















