Installation method for outdoor installation of hydraulic freight elevator:
(The first method) Use the movable scaffolding method to install the freight elevator step by step according to the project progress in the original way. The color steel tiles are also fixed one by one. Compared with the current installation method, the construction period is longer. If the storey height is somewhat higher, the installation Workers may not yet adapt.
(The second method) The freight elevator guide rails are welded on the ground and fixed directly with a crane. The color steel tiles are also sealed on the ground and fixed with a crane. In this way, the cost of two cranes is required to install one, and the color steel tiles need to be added on the ground. The frame can be fixed, but this method can save half of the installation time.