DC Aerial Work Platform With Lifting 25 Ft 350-Lb Capacity
video
DC Aerial Work Platform With Lifting 25 Ft 350-Lb Capacity

DC Aerial Work Platform With Lifting 25 Ft 350-Lb Capacity

1 Place the aerial working platform in a firm, level and barrier-free working area, and place the aluminum lift platform directly under the working area 2. Install the outriggers and adjust the horizontal position of the machine through the O-type spirit level 3. Connect to an appropriate power source (AC220V) 4. Pull the air switch in the electrical control box to the ON position 5. Unscrew the red emergency brake button 6. The operator enters the work platform to operate the control box button or the ground staff operates the button on the electrical control box to control the lifting of the platform. Press the green button to go up and the red button to go down. In case of tight color, please press the red emergency brake to cut off the power of the whole machine. (The control box button and the electrical control box button on the platform are used in parallel and have the same function). 7. If the platform cannot be lowered electronically, you can use the emergency oil drain switch, turn it counterclockwise until the platform descends, and tighten the emergency oil drain switch clockwise after the platform descends.
Send Inquiry
Description

lift Work Platform

aluminum lift platform
single mast lift table
aerial work platform

1 Place the aerial working platform in a firm, level and barrier-free working area, and place the aluminum lift platform directly under the working area
2. Install the outriggers and adjust the horizontal position of the machine through the O-type spirit level
3. Connect to an appropriate power source (AC220V)
4. Pull the air switch in the electrical control box to the ON position
5. Unscrew the red emergency brake button
6. The operator enters the work platform to operate the control box button or the ground staff operates the button on the electrical control box to control the lifting of the platform. Press the green button to go up and the red button to go down. In case of tight color, please press the red emergency brake to cut off the power of the whole machine. (The control box button and the electric control box button on the hydraulic lifting platform are used in parallel, and have the same function).
7. If the lifting platform cannot be lowered electronically, you can use the emergency oil drain switch to turn it counterclockwise until the platform descends. After the platform descends, the emergency oil drain switch must be tightened clockwise.

aerial work platformliftmobile vertical personnel liftelectric  liftAluminum lifting platformelectrci lift tablelift tablelift table supplier1China lift table Orderpicking Equipmenthome-order-picking_01home-order-picking_02indoors order picker


Hot Tags: dc aerial work platform with lifting 25 ft 350-lb capacity, China, manufacturers, suppliers, factory, customized, buy, cheap, for sale, made in China

Send Inquiry

(0/10)

clearall