Home > Knowledge > Content

Hydraulic pipeline installation of hydraulic equipment such as elevator lifts and stackers trucks

Dec 04, 2020

Before installing the hydraulic pipes of goods elevators and electric pallet stackers, all steel pipes can be pickled first, especially the steel pipes connected to the ferrule pipe joints should be pickled first, and then the ferrule should be pre-fastened to the pipe end;

All pipe joints used on cargo lifters and pallet stacker should be cleaned with kerosene before installation. The o-shaped sealing ring inside should be temporarily removed for storage, and then put on after the formal installation;

During the construction, keep the oil ports, pipe joints, pipe ends and other openings of pumps, distributors and other equipment clean and prevent foreign objects such as water and dust from entering;

The pipeline should be laid in a free state, and the welded pipeline shall not be forced to be fixed and connected by applying excessive radial force;

The oil hole of the bearing seat should be checked in advance, whether the internal oil circuit of the freight lift elevators and the electric forklift is unblocked, and whether the thread of the oil port matches the joint.


Send Inquiry